[technology sharing] the correct treatment method after the compressor is burnt out

visits:37 addtime:2023-10-11 16:38:25

1、 If the compressor has been burned out, mechanical failure, wear and tear, the refrigerant system will inevitably be polluted, and the situation is as follows:


1. The residual refrigeration oil has been carbonized, acid and dirty in the pipe.


2. After the compressor is removed, the pipe of the original system must be corroded with air, resulting in condensation effect, increasing the residual water content, and causing dirt film after corrosion with copper pipe and parts on the pipeline, which will affect the operation function after the next replacement of the compressor.


3. The worn copper, steel and alloy dirty powder must have flowed into the pipeline and blocked some fine pipes.


4. The original dryer has quickly absorbed a large amount of water.


In the above cases, the system has a bad smell, which is known as soon as it is smelled.




2、 The results are as follows after replacing the system with a new compressor


1. It is impossible to pump vacuum completely, and the vacuum pump is easy to be damaged.


2. After adding new refrigerant, the refrigerant can only clean the parts of the system, but the pollution of the whole system still exists.


3. The new compressor, refrigeration oil and refrigerant were all contaminated within 0.5-1 hour. The second pollution started immediately as follows:


3-1 after the oil is impure, it begins to destroy the original lubricating property.


3-2 metal dirt powder entering the compressor may break through the insulation film of the motor and short circuit, and then burn out.


3-3 the metal dirt powder sinks into the oil, causing the friction between the shaft and the shaft sleeve or other running parts to increase, and the machine will bite.


3-4 the mixture of refrigerant, oil, original pollutants and acidic substances will cause more acidic substances and water content increase.


3-5 copper plating phenomenon starts, the mechanical clearance decreases, increases friction and gets stuck.


4. If the original dryer is not replaced, the original water absorption and acid substances will be released.


5. Acid will slowly erode the insulation film of motor enameled wire.


6. The cooling effect of the refrigerant itself is reduced.


Under the above conditions, the new compressor will be completely burned in about one month.



3、 How to deal with the refrigerant system of a main engine which has been burned out or failed is a more serious and technical problem than the production of a new one. However, it is often completely ignored by most technicians, and even think that if it is broken, it can be replaced with a wrong idea. This leads to some disputes about the poor quality of compressor or improper use by others.


1. The compressor is damaged, of course, it needs to be replaced, and it is very urgent, but before taking action to prepare materials and tools, the following work should be done:


1-1 whether the contactor, overload device, or computer and temperature control in the control box have problems in quality, they must be checked one by one and confirmed to be OK.


1-2 whether various set values have been changed, and analyze whether the compressor is burnt out due to the change of setting value or wrong adjustment.


1-3 check and correct the abnormal conditions on the refrigerant pipeline.


1-4 confirm that the compressor is burnt out, stuck or half burnt out:


1-4-1 measure insulation with megger and coil resistance with triple meter.


1-4-2 talk with the relevant personnel of the customer to understand the general situation of the causes and consequences, as a reference for judgment.


1-5 try to drain the refrigerant from the liquid pipe, observe the residual matter discharged from the refrigerant, smell its taste and observe its color. (after burning, it is sour and sometimes pungent)


1-6 after removing the compressor, pour out a little frozen oil and observe its color to judge the situation. Before leaving the main engine, wrap the high and low pressure branch pipes with tape or close the valve.




2. According to the above inspection work, there may be three kinds of compressor faults:


The motor of 2-1 compressor is not burnt out, the current is normal, only the noise is loud. (mechanical problems)


The motor of 2-2 compressor is not burnt out and can run well. However, the motor is overloaded due to large current and easy tripping.


The motor of 2-3 compressor has been burnt out and can not run, and the mechanical quality is unknown.


According to the three conditions, the procedure for updating the compressor is as follows:


The motor of 2-1 compressor is not burnt out, the current is normal, only the noise is loud. (mechanical problems)


2-1-1 in this case, the oil is not odorous, and the pollution is only in the form of powder gray, which settles in the compressed interior, and the pollution in the system pipe is not obvious.


2-1-2 remove the original dryer, use nitrogen as much as possible (the pressure is at least 7kg / cm2) to clean the high-pressure end pipeline, the liquid pipe and some parts of the low-pressure end from the high-pressure end, and observe whether the blown out is oil, dirt, water or other abnormal or foreign matters.


2-1-3 after the new compressor is replaced, install a new dryer and add nitrogen pressure to 10kg / cm2 to detect the leakage. If there is no leakage, the remaining nitrogen will be discharged into the atmosphere through the high-pressure end filling valve.


2-1-4 vacuumize at least 1000 microns from high and low pressure ends simultaneously.


2-1-5 add liquid refrigerant into the liquid pipe part, when the amount of refrigerant reaches 80% ~ 90%, the machine can be started for test. (the compressor must be heated for 2 hours)


The motor of 2-2 compressor is not burnt out and can run well. However, the motor is overloaded due to large current and easy tripping.


2-2-1 in this case, the oil is slightly burnt and discolored, the system pipeline is clean, but the metal surface has been acidified, the inner wall of copper pipe turns red.


2-2-2 after the new compressor is replaced, install a new dryer and add nitrogen pressure to 10kg / cm2 to detect leakage. If there is no leakage, the remaining nitrogen will be discharged into the atmosphere through the high-pressure end angle valve.


2-2-3 vacuumize at least 1000 microns from high and low pressure ends simultaneously.


2-2-4 add liquid refrigerant into the liquid pipe part, when the amount of refrigerant reaches 80% ~ 90%, the machine can be started for test. (the compressor must be heated for 2 hours)




In this case, we must pay attention to: the stability of the original power supply and the possible load are too similar, or the result of stopping control is too frequent. If these problems are not solved, the danger always exists, or can not be completely solved.




The motor of 2-3 compressor has been burnt out and can not run, and the mechanical quality is unknown. (there are two ways to solve the problem and fix it)


a. Method 1


A-1 this kind of situation * is that the oil and refrigerant stink, scorch and spicy, and the oil turns black like black ink. The pipe is covered with dirty black film and there will be water.


A-2 remove the dryer and short connect this part to a copper pipe joint or a temporary detachable nozzle.


A-3 use a chemical pump to pump the cleaning agent (trichloroethane, dichloromethane) into the pipeline system from the high-pressure pipe for cleaning and circulating flow.


Note: 1. Pay attention to the safety of operators when cleaning.


2. During cleaning, it will be found that the cleaning agent is clear and dirty. If necessary, it is necessary to replace the cleaning agent and clean it several times.


A-4 the pressure of nitrogen for replacement is about 7kg / cm2 ~ 10kg / cm2, and the whole system will be dried. If the compressor has been burned or mechanical failure or worn out, the refrigerant system will inevitably be polluted. The situation is as follows:


1. The residual refrigeration oil has been carbonized, acid and dirty in the pipe.


2. After the compressor is removed, the pipe of the original system must be corroded with air, resulting in condensation effect, increasing the residual water content, and causing dirt film after corrosion with copper pipe and parts on the pipeline, which will affect the operation function after the next replacement of the compressor.


3. The worn copper, steel and alloy dirty powder must have flowed into the pipeline and blocked some fine pipes.


4. The original dryer has quickly absorbed a large amount of water.


In the above cases, the system has a bad smell, which is known as soon as it is smelled.


After a-5 is replaced with a new compressor, install a new dryer and add nitrogen pressure to 10kg / cm2 to detect leakage. If there is no leakage, the remaining nitrogen will be discharged into the atmosphere through the high-pressure end valve.


A-6 is vacuumized from both high and low pressure ends to at least 1000 microns.


A-7 check all electrical equipment and power supply.


A-8 the liquid refrigerant is added into the liquid pipe to reach 80% ~ 90% of the refrigerant quantity before starting the machine for testing. (the compressor must be heated for 2 hours)

b. Method 2


B-1 remove the dryer and blow through the whole pipeline with high-pressure nitrogen of about 10kg / cm2.


B-2 replace the dryer with a new one (the filtration capacity of the liquid tube dryer is twice the capacity of the original system). )


B-3 check all parts, the quality of external control parts must be good.


B-4 leak detection of the whole system, the remaining nitrogen is discharged into the atmosphere by the high-pressure end angle valve.


B-5 is vacuumized to at least 1000 microns from both high and low pressure ends.


B-6 the liquid refrigerant is added into the liquid pipe part to reach 80% ~ 90% of the refrigerant quantity before starting the machine for test. (the compressor must be heated for 2 hours)


After the operation of B-7, special attention must be paid to the occurrence of abnormal conditions and emergency treatment.


B-8 runs for about half an hour after starting, replace the dryer immediately, and observe its dirt


B-9 for the second time, the new dryer must be operated for another 3 hours. Observe the results and replace it if necessary until the system is completely clean.


After B-10 *, change the refrigeration oil of the compressor and observe the new oil of the original * *.


Note: A. when the dryer is replaced, the air should not enter the system again.


b. In serious cases, the compressor should be removed and replaced with oil, and the refrigerant should be discharged and replaced.


Note: 1. Make another visual inspection for the whole machine before starting up.


2. Pay special attention to power supply and voltage insulation.


3. Do not start the compressor while adding refrigerant after vacuumizing, which will cause the compressor to lose oil and lose all previous efforts.


4. Do not add liquid refrigerant directly from the low pressure end, which will cause liquid hammer and mechanical failure.


5. When the above procedures are completed completely, before starting up, it is necessary to correct some poor quality electrical appliances found in the original inspection of the machine.




4、 The results are as follows after replacing the system with a new compressor


1. It is impossible to pump vacuum completely, and the vacuum pump is easy to be damaged.


2. After adding new refrigerant, the refrigerant can only clean the parts of the system, but the pollution of the whole system still exists.


3. The new compressor, refrigeration oil and refrigerant were all contaminated within 0.5-1 hour. The second pollution started immediately as follows:


3-1 after the oil is impure, it begins to destroy the original lubricating property.


3-2 metal dirt powder entering the compressor may break through the insulation film of the motor and short circuit, and then burn out.


3-3 the metal dirt powder sinks into the oil, causing the friction between the shaft and the shaft sleeve or other running parts to increase, and the machine will bite.


3-4 the mixture of refrigerant, oil, original pollutants and acidic substances will cause more acidic substances and water content increase.


3-5 copper plating phenomenon starts, the mechanical clearance decreases, increases friction and gets stuck.


4. If the original dryer is not replaced, the original water absorption and acid substances will be released.


5. Acid will slowly erode the insulation film of motor enameled wire.


6. The cooling effect of the refrigerant itself is reduced.


Under the above conditions, the new compressor will be completely burned in about one month.


主站蜘蛛池模板: 91精品情国产情侣高潮对白文档_99久久中文字幕_91老司机深夜福利精品视频在线观看_日韩欧美亚洲成人_国产精品美女乱子伦高潮_成人毛片一区二区三区 | 在线观看亚洲精品国产福利片_欧洲极品少妇_麻豆tv在线看_亚洲大片_2018日日夜夜操_色老大久久综合网天天 | 久久久穴_九九九九免费视频_西西人体44www大胆无码_日韩精品在线看_日韩女同一区二区三区在线观看_斗破苍穹第三季免费观看 | 99国精产品一区一区_欧美一级黄色片免费看_亚洲色欲在线播放一区_快穿妲己高H荡肉呻吟NP_亚洲欧美精品伊人久久_综合久久中文字幕 | 国产日韩在线观看一区_最新的国产成人精品2021_国产高清视频在线观看_伊人久久一区二区三区小说_影音先锋在线资源中文字幕_果冻传媒精选一区二区 | 国产精品内射久久久久欢欢_国产午夜久久av_美女免费视频黄_毛片自拍_精品婷婷色一区二区三区_亚洲乱亚洲乱妇无码麻豆 | 欧美伦理第一页_91精品国产综合久久久蜜臀九色_亚州综合图区_av老司机午夜福利片免费观看_国产精品久久久久7777按摩_极品一级片 | 欧美xxx片_免费av网站在线播放_免费看一级黄色大片_成人黄页网站视频_奇米777四色影色在线看_色一情一区二区三区四区 | 人人妻人人澡人人爽欧美一区双_少妇久久久久久被弄到高潮_mm131美女视频毛片_精品久久久无码中字_78摸在线观看_4虎影院在线观看 | 亚洲丝袜另类校园欧美_永久不封国产毛片AV网煮站_HEYZO高清中文字幕在线_se视频在线_一级特大黄a爱片免费免免_免费日本特黄 | 国产一级特黄特色毛片_久久69_亚洲另类自拍丝袜第五页_国产精品乱码一区二区三区软件_精品中文字幕一区二区三区_先锋影音源资2019在线 | 色老99久久精品偷偷鲁_欧美成视频_人与人性恔配视频免费_天天射夜夜拍_在线免费一区_黄色一级淫片 | 亚洲人成色77777在线观看_亚洲一区二区三区偷拍女厕_天天操天天舔天天干_av无码最新在线播放网址_蜜桃av成人_黄色av网站在线观看 | 中文字幕亚洲情99在线_久久久久久国产精品日本_欧美日色_免费看成年人_91免费看片_国产精品亚洲аv无码播放 | 久久高清片_久久久黄网_国产视频1区_五月精品夜夜春夜夜爽久久_91精品免费在线_99c视频在线观看 | 伦一理一级一a一片_av亚洲av影院av天堂_日本三级在线观看网站_国产AV国片偷人妻麻豆郑州公司_亚洲免费二区三区_免费看片一区二区三区 | 狂野欧美性猛交xxxxx视频_国产精品亚洲一区二区三区久久_搡老女人老91妇女老熟女_久久久综合九色合综_亚洲国产精彩中文乱码AV_国产91在线播放九色000 | 91桃色破解_国产一级揄自揄精品视频_国产麻豆VIDEOXXXX实拍_精品人妻久久久久久888_国产精品久久久久免费观看视频_av一区二区在线观看 | 国产精品视频永久免费播放_亚洲精品一区二区三区_女被c黄扒衣服视频_美女黄网_国产成人精品福利网站_亚洲拍宾馆视频播放 | 亚洲AV福利天堂一区二区三_免费看中国毛片_久操视频网_手机永久无码国产AV毛片_国产欧美一区二区视频_制服丝袜中文字幕第一页 | 蜜桃视频在线观看网站_欧美性妇_国产精品另类_无码超级大爆乳在线播放_国产乱子伦视频在线观看_亚洲av在线一区二区三区 | 性少妇videosexfreexxxx_亚洲一区自拍偷拍_亚洲人成日韩中文字幕不卡_国产在线不卡观看_免费视频成人片在线观看_国产精品久久人 | 狼群视频在线观看www_久久夜夜免费视频_四虎最新地址_成人国产欧美大片一区_久久久久亚洲AV无码A片_久久se精品一区二区 | 踪合国产第二页_国产SUV精品一区二区88L_猫咪社区免费资源在线观看_一级毛片视频免费观看_国产精品麻_久久理论视频 | 天堂在线最新版www中文_av操操操_久久综合久久美利坚合众国_99国产欧美久久久精品蜜芽_国产人妻无码精品_亚洲私人影院 | ā片在线观看免费观看_FREEXXXXHD麻豆精品A∨_91看片免费_亚洲精品AV无码精品_天天添夜夜操_天啪天天干 | 久久久久亚洲AV成人片_xxddcc羞羞答答_99精品热6080yy久久_日本处XXXX19_九九成人_毛色毛片免费观看 | 色情推油按摩G点高潮无码视频_久久精品中文字幕大胸_一二三四日本视频中文_欧美在线影院_亚洲一在线_欧美a级毛片免费播敢 | blacked欧美极品一区_国产videos久久_国产91久久久_大伊香蕉精品视频在线_一区二区三区在线播放视频_美国少妇性xxxx另类 | 欧美在线二区_大战刚结婚的少妇_91rb成人_freechinese内射少妇_精品一区二区视频_a级黄色毛片视频 | 亚洲精品精_av综合一区_91精品人妻一区二区三区_最近更新2019中文字幕_欧美特级bbb毛片_女女同性女同一区二区三区91 | 蜜汁av在线_玩弄漂亮少妇高潮大叫_中文字幕有码无码人妻AV蜜桃_国产乱人伦AVA麻豆软件_国产精品亚洲第一区_中文字幕第88页 | 深夜精品福利_成人在线免费视频播放_亚洲成人视屏_精品国产欧美另类一区_亚洲国产精品成人久久蜜臀_国产精品亚 | 熟女系列丰满熟妇AV_免费观看黄视频_久久99性xxx老妇胖精品_国产一区在线观看麻豆_特级做爰图片_日本高清色视频在线播放 | 男人边吃奶摸下激烈免费视频_人人爽久久涩噜噜噜av_性姿势108式大全_a级黄色免费观看_色综合91久久精品中文字幕_91精品国产乱码久久久 | 免费人成无码视频在线观看_99久久亚洲一区二区三区青草_国产无套流白浆视频免费_色婷婷综合久久久久中文字幕_国产AV妓女影视妓女影院_日本亚洲精品一区二区三 | 欧美日韩视频在线第一区_中文字幕第2页不卡_久久9999免费视频_久久久久久一级_久久久综_亚洲永久字幕 | 国产亚洲中文字幕_欧美xxxx精品另类_欧美视频一区二区_中文字幕123区_办公室被吃奶好爽在线观看视频_免费无码AV片在线观看中文 | 午夜福利片1000无码免费_性高朝久久久久久久久久_麻豆免费看片_插吧插吧综合网_91亚洲欧美_日韩黄色三级视频 | 欧洲色阁中文字幕_www.17.com嫩草影院_瑟瑟久久_欧美亚洲另类久久综合二区_97超碰自拍_日韩av中文字幕一区二区 | 日韩欧美中文在线观看_www插插插_国产精品自在在线午夜_日皮视频在线观看免费_波多野结衣久久一区二区_热の综合热の国产热の潮在线 |